Rakennuslehti
Rakennuslehti is a news and trade journal launched in 1966. The journal is aimed at construction engineers employed as managers, designers and foremen in construction, graduate and nongraduate engineers and other decision-makers in the construction industry.
Magazine's website: http://www.rakennuslehti.fi/ Follow us :
Advertisement sales
Advertisement sales | Sanoma Tekniikkajulkaisut Oy |
---|---|
Phone | 020 741 8600 |
toimitus@rakennuslehti.fi | |
Contact person |
Jari Inkinen 040-716 0113 jari.inkinen@sanoma.com |
Contact person |
Elina Rökman 040-356 1874 elina.rokman@sanoma.com |
Contact person |
Tomi Huiko 040 414 5000 tomi.huiko@sanoma.com |
Contact info
Publisher | Sanoma Tekniikkajulkaisut Oy |
---|---|
Visiting address |
Porkkalankatu 20 A 00180 Helsinki |
Postal address |
PL 100 00040 Sanoma |
Phone | 020 741 8600 |
Magazine's email | toimitus@rakennuslehti.fi |
Päätoimittaja | Tapio Kivistö |
Toimituspäällikkö | Anne Korhonen |
Toimitussihteeri | Hannu Lättilä |
Circulation or copies
Copies | 35500 |
---|---|
Issues per year | 40 |
Online audience
Magazine's website | http://www.rakennuslehti.fi |
---|
Average weekly reach Source: FIAM
Average weekly pageviews Source: FIAM
Tavoittavuusluvut ja sivulatausten määrät ovat kunkin kuukauden viikkolukujen keskiarvoja. Viikot määräytyvät osaksi sen kuukauden lukuja, jolle suurempi osa kyseisen viikon päivistä osuu. Yksittäisten viikkojen luvut ovat nähtävissä FIAM:in julkisella viikkolistalla.
Timetable
Issue | Publishing date | Reservation | Material | Research number | Additional info |
1 | 26.01.2024 | 17.01.2024 | 22.01.2024 | Theme: Construction professionals, recruitment and education | |
2 | 02.02.2024 | 24.01.2024 | 29.01.2024 | Theme: Renovation, apartment housing and property management | |
3 | 09.02.2024 | 31.01.2024 | 05.02.2024 | Theme: New products and methods | |
4 | 16.02.2024 | 07.02.2024 | 12.02.2024 | Theme: Digitalisation and data modelling in the construction industry | |
5 | 23.02.2024 | 14.02.2024 | 19.02.2024 | Theme: Sustainability in construction | |
6 | 01.03.2024 | 21.02.2024 | 26.02.2024 | Theme: Infrastructure, municipal services | |
7 | 08.03.2024 | 28.02.2024 | 04.03.2024 | Theme: Renovation, housing health | |
8 | 15.03.2024 | 06.03.2024 | 11.03.2024 | Theme: Building technology and production, and construction quality | |
9 | 22.03.2024 | 13.03.2024 | 18.03.2024 | Theme: Facades, roofs and insulation materials | |
10 | 05.04.2024 | 26.03.2024 | 28.03.2024 | Theme: Housing company maintenance and renovation projects | |
11 | 12.04.2024 | 03.04.2024 | 08.04.2024 | Theme: High-rise buildings | |
12 | 19.04.2024 | 10.04.2024 | 15.04.2024 | Theme: Planning, consulting and certification | |
13 | 26.04.2024 | 17.04.2024 | 22.04.2024 | Theme: Future construction and innovations | |
14 | 03.05.2024 | 23.04.2024 | 26.04.2024 | Theme: Building technology, new products and innovations | |
15 | 17.05.2024 | 08.05.2024 | 13.05.2024 | Theme: Architecture, multifunctionality and adaptability | |
16 | 24.05.2024 | 15.05.2024 | 20.05.2024 | Theme: THE BIGGEST | |
17 | 31.05.2024 | 22.05.2024 | 27.05.2024 | Theme: Infrastructure construction, road network maintenance | |
18 | 07.06.2024 | 29.05.2024 | 03.06.2024 | Theme: Renovations, modernisation projects | |
19 | 14.06.2024 | 05.06.2024 | 10.06.2024 | Theme: New products and methods | |
20 | 16.08.2024 | 07.08.2024 | 12.08.2024 | Theme: Construction professionals, recruitment and education | |
21 | 23.08.2024 | 14.08.2024 | 19.08.2024 | Theme: Earthworks and major infrastructure projects | |
22 | 30.08.2024 | 21.08.2024 | 26.08.2024 | Theme: Renovation, public buildings and indoor air | |
23 | 06.09.2024 | 28.08.2024 | 02.09.2024 | Theme: Urbanisation and infill construction | |
24 | 13.09.2024 | 04.09.2024 | 09.09.2024 | Theme: Smart buildings | |
25 | 20.09.2024 | 11.09.2024 | 16.09.2024 | Theme: Circular economy and the green transition | |
26 | 27.09.2024 | 18.09.2024 | 23.09.2024 | Theme: Renovations, residential repairs and maintenance | |
27 | 04.10.2024 | 25.09.2024 | 30.09.2024 | Theme: Finnbuild I | |
27 B | 04.10.2024 | 13.09.2024 | 30.09.2024 | Theme: Trade fair catalogue (an insert in the magazine) | |
28 | 11.10.2024 | 02.10.2024 | 07.10.2024 | Theme: Finnbuild II | |
29 | 18.10.2024 | 09.10.2024 | 14.10.2024 | Theme: Sustainability in construction | |
30 | 25.10.2024 | 16.10.2024 | 21.10.2024 | Theme: Energy efficiency and costs | |
31 | 01.11.2024 | 23.10.2024 | 28.10.2024 | Theme: Wood construction | |
32 | 08.11.2024 | 30.10.2024 | 04.11.2024 | Theme: Building technology and energy solutions | |
33 | 15.11.2024 | 06.11.2024 | 11.11.2024 | Theme: Infrastructure construction | |
34 | 22.11.2024 | 13.11.2024 | 18.11.2024 | Theme: Renovations, façades, balconies and windows | |
35 | 29.11.2024 | 20.11.2024 | 25.11.2024 | Theme: Major construction projects | |
36 | 13.12.2024 | 03.12.2024 | 09.12.2024 | Theme: Annual review and the best of the year |
Advertisement rates
etusivu
Position: 1. Cover
Size excluding margin: 254 x 290 mm
4-colour price 13950 €
2/1
Position: Not specified
Size excluding margin: 524 x 365 mm
4-colour price 13950 €
2/1
Position: First spread
Size excluding margin: 524 x 365 mm
4-colour price 15450 €
1/1
Position: Not specified
Size excluding margin: 254 x 365 mm
4-colour price 11250 €
1/1 takasivu
Position: Back cover
Size excluding margin: 254 x 310 mm
4-colour price 12250 €
A4
Position: Not specified
Size excluding margin: 210 x 295 mm
4-colour price 8250 €
1/2
Position: Not specified
Size excluding margin: 125 x 365 mm
4-colour price 5990 €
1/2
Position: Not specified
Size excluding margin: 254 x 180 mm
4-colour price 5990 €
1/4
Position: Not specified
Size excluding margin: 125 x 180 mm
4-colour price 3090 €
1/4
Position: Not specified
Size excluding margin: 168 x 135 mm
4-colour price 3090 €
6x120
Position: Not specified
Size excluding margin: 254 x 120 mm
4-colour price 3990 €
6x100
Position: Not specified
Size excluding margin: 254 x 100 mm
4-colour price 3390 €
3 x 120
Position: Not specified
Size excluding margin: 125 x 120 mm
4-colour price 1890 €
2 x 120
Position: Not specified
Size excluding margin: 82 x 120 mm
4-colour price 1250 €
2 x 60
Position: Not specified
Size excluding margin: 82 x 60 mm
4-colour price 690 €
2. sivun moduli
Position: Not specified
Size excluding margin: 254 x 120 mm
4-colour price 4190 €
3. sivun moduli
Position: Not specified
Size excluding margin: 125 x 50 mm
4-colour price 870 €
takasivun moduli
Position: Not specified
Size excluding margin: 254 x 120 mm
4-colour price 4190 €
takasivun silmäkulma
Position: Not specified
Size excluding margin: 53 x 38 mm
4-colour price 590 €
Prices doesn't include tax.
Technical data
Size mm | 280 x 400 mm |
---|---|
Printing area mm | 254x365 mm |
Bleed mm | 0 mm |
Number of colums | 6 |
Column width | 39 mm |
Printing process | Offset |
Binding | Saddle-stitching |
Printing house
Printer | PunaMusta Oy , Tampere |
---|
Technical info / material
Ad material delivery | |
---|---|
Technical data | AINEISTOJEN TEKNISET VAATIMUKSET Valmis aineisto on PDF-tiedosto, joka sisältää kaikki ilmoitukseen kuuluvat elementit: tekstit, kuvat, grafiikat, ja fontit. Valmista aineistoa ei muokata lehdessä, vaan se julkaistaan sellaisenaan. Kuvien resoluution optimi on 300 dpi, minimi 225 dpi, kun kuva on 1:1 taitto-ohjelmassa. Leikkuuvaroja ilmoituksiin ei tarvita. Tekstinkäsittelyohjelmilla tehdyistä aineistoista veloitetaan normaalit asemointikulut. VALMIIDEN AINEISTOJEN TOIMITUS Varauksen tehtyäsi saat latauslinkin, jolla voit lähettää valmiit PDF-muotoiset ilmoitukset aineistopalveluumme vielä ilmestymisviikon maanantaihin klo 12 saakka. Ilmoitusvarauksessa ilmoitettu aineistontoimittaja saa linkin sähköpostiinsa. VALMISTETTAVIEN AINEISTOJEN TOIMITUS Varauksen tehtyäsi saat latauslinkin, jolla voit lähettää aineistokäsikirjoituksen ja tarvittavat materiaalit aineistopalveluumme. Ilmoitusvarauksessa ilmoitettu aineistontoimittaja saa linkin sähköpostiinsa. Käsikirjoitukseksi sopii tekstitiedosto (word), jossa on ilmoituksen tekstisisältö. Tämän lisäksi tarvitaan hyvälaatuiset, painokelpoiset kuvat ja logot. Kuvien minimitarkkuus on 225 dpi ja logot kannattaa toimittaa ensisijaisesti vektorimuodossa. Materiaalien tulee olla Rakennuslehdessä ilmestymisviikkoa edeltävänä perjantaina klo 12. LISÄTIEDOT Lisätietoja aineistojen toimittamisesta ja aineistovaatimuksista saa osoitteesta mediapalvelu@sanoma.com. |
Terms of delivery
1. Maksuehdot:
Auktorisoiduille mainostoimistoille 30 pv netto. Muille 14 pv netto.
2. Viivästyskorko:
Viivästyskorko 9%.
3. Mainostoimistopalkkio:
Auktorisoidut mainostoimistot sopimuksen mukaan.
4. Alennukset:
5. Reklamaatiot:
Noudatamme voimassa olevia ilmoitusten julkaisusääntöjä. Muistutus virheellisestä ilmoituksesta on tehtävä kirjallisesti 8 päivän kuluessa ilmestymisestä. Lehti ei vastaa puhelimitse jätettyjen ilmoitusten virheettömyydestä.
Lehden vastuu virheistä rajoittuu enintään ilmoitushintaan.
6. Ilmoituksen peruuttaminen:
Ilmoitus on peruutettava kirjallisesti 14 vrk ennen ilmestymistä. Etusivun peruutus viimeistään 1 kk ennen. Tämän jälkeen peruutetuista veloitetaan 30% ilmoitushinnasta.
7. Lehden vastuu ilmoituksesta:
Lehden vastuu virheistä rajoittuu enintään ilmoitushintaan.